Road Conditions and Summer Information

SR-210:  Open

Summer recreation management in Alta will change in many ways this upcoming summer. Please visit https://www.alta.com/summer  for more information on Alta Ski Area’s summer program. Please note that the Albion Basin Summer Road shuttle will not run this summer; instead, Alta Ski Area will operate Sunnyside Lift. See below for more details.

SUMMER ROAD STATUS:  Tentative opening: June 30, 2018.

SUMMER BOOTH HOURS:  Tentative: 7 AM – 8 PM

SUNNYSIDE LIFT:  Weekends and holidays 9 AM – 6 PM

RESTROOMS:  Flush toilets will be available at Albion Grill, with pit toilets available in Albion Basin.

ALBION DAY LODGE GRILL:   7:30 AM – 7 PM weekends and holidays, 11 AM – 7 PM weekdays

ALBION BASIN CAMPGROUND:  Tentative opening July 15; visit https://www.recreation.gov/camping/albion-basin/r/campgroundDetails.do?contractCode=NRSO&parkId=70226 for more information and to make a reservation

SUMMER RECREATION MAPhttp://townofalta.com/wp-content/uploads/2016/01/BACK-summer-brochure-May-2016.final_.pdf

ALTA CENTRAL: 801.742.3522, recorded information line 801.742.3403, Twitter @AltaCentral

ALTA SKI AREA: 801.359.1078

HELLGATE GAZEX CONSTRUCTION CLOSURE:  UDOT will commence construction of Phase II of the Avalanche Safety Improvement Plan in the Hellgate area on May 21, 2018. The project consists of eight Remote Avalanche Control Systems (RACS) permanently installed in the starting zones above the Hellgate cliffs. In the interest of public and worker safety, the entire construction zone will be closed to public access for the duration of the project. This includes the runout zones below where rock fall, both natural and work related, may impact.

The climbing and construction areas are located on private land and at the request of the landowner, will be CLOSED. These areas include, all of the Main Slidepath Area, Main Wall, Tower 3, 2, 1, Hell is for Children, and Altaworld.  The Condo Wall and The Clamshell will remain OPEN for the entire project.

The projected completion date and subsequent reopening of the climbing areas is planned for mid-October 2018. Please respect the closure and stay clear of the area.

For more information regarding the closure and the project go to:  www.udot.utah.gov/avalanche

Last updated: June 5, 2018 at 12:07 pm